| HIGH CLOSE SCHOOL - Wokingham |
 |
 |
| Construction of detached gymnasium and changing rooms. |
 |
| Contract Duration |
- |
18 weeks |
| Contract Basis |
- |
JCT 2005 Design & Build |
|
 |
| < BACK TO EDUCATION LIST |
|
|
 |
|
 |
|
“I WOULD LIKE TO TAKE THIS OPPORTUNITY TO THANK YOU FOR THE COMMITMENT MADE BY YOU AND YOUR STAFF IN MAKING THE SPORTS HALL A REALITY AND FOR YOUR COMPANY’S VERY POSITIVE ATTITUDE THROUGHOUT THE CONTRACT. IN PARTICULAR YOUR DETERMINATION THAT THE CUSTOMER SHOULD BE COMPLETELY SATISFIED WITH THE FINISHED PRODUCT WAS REMARKABLE.
WE ARE VERY SATISFIED.
I HAVE MANAGED HUNDREDS OF PROJECTS OVER MY THIRTY YEARS IN THE INDUSTRY AND I CAN TRUTHFULLY SAY THAT I HAVE RARELY HAD THE PLEASURE OF WORKING WITH A CONTRACTOR DISPLAYING SUCH A LEVEL OF ALL ROUND COMPETENCE AS THAT POSSESSED BY TALBOT CONSTRUCTION.”
STEVE JESSUP, ASSISTANT DIRECTOR – PROPERTY, BARNARDO’S LONDON EAST AND SOUTH EAST REGION
|
|
 |
|