| SHEPPERTON STUDIOS - Shepperton |
 |
 |
| Construction of a steel framed aluminium clad industrial unit at Shepperton Studios. |
 |
| Contract Duration |
- |
18 weeks plus phase 2 works |
| Contract Basis |
- |
to follow |
|
 |
| < BACK TO COMMERCIAL LIST |
|
|
 |
|
 |
|
“FOLLOWING RECOMMENDATION FROM DAVID ZIMBER OF JON BRADLEY LTD, TALBOTS WERE AWARDED THE PROJECT OF CONSTRUCTING TWO WORKSHOPS FOR PINEWOOD SHEPPERTON FILM STUDIOS AND TELEVISION STUDIOS UK IN SHEPPERTON.
THIS PROJECT REQUIRED A GREAT DEAL OF TEAM WORK BETWEEN JOHN QUIRKE,-GROUP HEAD OF ESTATE MAINTENANCE, THE ARCHITECTS…, JON BRADLEY LTD AND TALBOT’S TO ENSURE SAFE ACCESS TO THE WORKING STUDIOS AND WORKSHOP WAS APPLIED AND MAINTAINED THROUGHOUT THE PROJECT.”
DAVID ZIMBER – JON BRADLEY LTD
|
|
 |
|