| MINI - Sunningdale |
 |
 |
| Conversion and refurbishment of existing BMW showroom and Rolls Royce showroom into seperate MINI and Rolls Royce showrooms with. This contract also included works to attached offices, reprofile facade and roof, resurfacing of car park and access road. |
 |
| Contract Duration |
- |
14 weeks |
| Contract Basis |
- |
D & B JCT 2005 |
|
 |
| < BACK TO AUTOMOTIVE LIST |
|
|
 |
|
 |
|
“THE NEW ROLLS ROYCE AND MINI SHOWROOM AT OUR SUNNINGDALE SITE WERE CONSTRUCTED DURING THE SECOND HALF OF 2009. TALBOT’S DESIGN INPUT AND VALUE ENGINEERING EXPERTISE ENABLED US TO CONSTRUCT TWO SHOWROOMS TO THE VERY HIGH STANDARDS THAT SYTNER EXPECT BUT AT A COST THAT WAS ACCEPTABLE IN THESE DIFFICULT TIMES. HAVING BUILT THE BMW SHOWROOM AND THE SEPARATE OFF SITE WORKSHOPS, TALBOTS WERE THE NATURAL CHOICE TO COMPLETE THE LAST PHASE OF THE RE-BUILDING PROJECT. THE QUALITY AND DESIGN FLARE OF THE TWO SHOWROOMS ARE A PERFECT SETTING FOR THE MINI AND ROLLS ROYCE BRANDS DISPLAYED.”
PETER HUXLEY, GROUP PROJECT MANAGER FOR SYTNER GROUP
|
|
 |
|