| AUDI - West London |
 |
 |
| Fit out a very high specification Audi Quattro Lounge in 5
weeks. The works included providing full air temperature
control to the room, soft finishes to the floor, walls and ceiling
along with a state of the art lighting 'Lutron' controlled system.
|
 |
| Contract Duration |
- |
5 weeks |
| Contract Basis |
- |
JCT 05 Minor Works Building Contract with Contractors Design Rev 2 2009 |
|
 |
| < BACK TO AUTOMOTIVE LIST |
|
|
 |
|
 |
|
“THE FINAL FIT OUT WORKS WERE EXTREMELY IMPORTANT TO AUDI UK IN COMPLETING THE HIGHEST QUALITY FOR THE WORLD’S LARGEST AUDI CENTRE. TALBOTS REACTED POSITIVELY TO THE HIGH DEMANDS OF THE PROJECT AND WORKED WELL WITHIN VERY TIGHT TIMESCALES TO DELIVER A HIGH QUALITY PRODUCT.”
WESLEY BOSWELL, STANDARDS & POLICY MANAGER, AUDI UK
|
|
 |
|